Traffic Updates for 15.03.2016 Continuous rainfall for last four days all along the NHW-1A and 1-B resulted in shrinking of existing road formation at some places like Mandir point Patnitop, Nashri, Peerah, Mehar, Marog, Battery Chasma and Sher Bibi due to which two heavy vehicles cannot pass simultaneously at these locations. Before the stretches could